top of page

DATA CENTER & TELECOMMUNICATION

INFRASTRUCTURE CONSTRUCTION

A main differentiator between BMM Builders and other construction services firm is our expertise & focus on technology.  Our consultants have designed and implemented fault tolerant and resilient technology infrastructure for some of the country’s best and largest healthcare, university, and enterprise customers. In support of this service we have BICSI certified Registered Communication Distribution Designers (RCDD) & Cisco Certified Network Professionals (CCNP) on staff to ensure that all components of the technology system are properly designed and accounted for as the building moves from schematic design (SD), through Construction Documents (CD) to final commissioning.

 

We have the expertise to design and implement all power, cooling, and telecommunications infrastructure for any sized environment.  We can also assist in determining if your specific environment would be better suited for the cloud or a hybrid solution with an on-premise data center. If an on-premise data center is not aligned with an enterprises requirements, we can assist in the design and construction of the intermediary facilities required to interface with a cloud-based solution.  We also offer outside plant telecommunication services to facilitate bringing service providers into the minimum point of entry (MPoE) in a way that prevents a single point of failure.

©2018 by BMM Builders, Inc. |  Fountain Valley, CA | (714) 804-0373 | info@bmmbuild.com

  • LinkedIn Social Icon
  • Facebook Social Icon
bottom of page